Case: Electric Castle
Date
15-18 July 2019
Case: Electric Castle
Electric Castle is a festival with a very diverse line-up. During four days filled with shows, various international acts enter the main stage. For these artists and their corresponding teams Electric Castle wants to meet all technical requirements, for which 4Light has been the technical partner since the year 2017.
In cooperation with the customer, 4Light mapped out all the locally available materials. These materials in combination with Dutch material and crew, ensured cost efficiency and a high quality of the technical part of the show.
Together with the materials, 4Light’s team members travelled to Electric Castle and were there from the start of the load-in until the last box was loaded into the trailer for the return trip. 4Light communicated with the visiting acts to meet the planning and technical details.
The added value of 4Light during this project consisted of multiple aspects. 4Light was able to offer valuable advice on various issues, was flexible in its cooperation with all the local and international parties, suppliers and staff and took care of the entire technical production from beginning to end.